12 September 2008 
The distance between the sinkhole and the by-pass railroad at Berezniki has not changed over the last 2 months
As of 4 September 2008 the distance between the sinkhole and the rail by-pass at Berezniki remained the same as 2 months before – 100 m... More
06 August 2008 
Silvinit subsidiary paid for the license granting mining rights at the Polovodovsky area of the Verkhnekamskoye potassium and magnesium deposit
On 28 July 2008 JSC Kamskaya Mining Company, a subsidiary of JSC Silvinit, paid 35.14 billion roubles for mining rights at the Polovodovsky area of the Verkhnekamskoye potassium and magnesium deposit... More
05 August 2008 
Potash production and sales at JSC Silvinit in 1h 2008
In 1h 2008 potash production and sales at JSC Silvinit were as follows... More
17 April 2008 
JSC Silvinit increased potash production in the 1st quarter 2008 by 2%
In the 1st quarter 2008 potash output at JSC Silvinit increased by 2.17% to 843 172 t Ê2Î against the same period of 2007... More
27 March 2008 
Reconstruction of the 6th granulation plant at JSC Silvinit is completed
JSC Silvinit has completed and put into operation the 6th granulation plant at Solikamsk-2... More
18 February 2008 
In 2008 JSC Silvinit`s investment programme is estimated at above 8 billion roubles
In 2008 JSC Silvinit intends to invest more than 8 billion roubles in production and infrastructure development projects... More
17 January 2008 
In 2007 potash output at JSC Silvinit was 5.47 m t KCl
In 2007 JSC Silvinit increased production of potash to 5 469.72 ths. t KCl ... More
20 December 2007 
Construction of the retaining wall of the 800 m rail track in Berezniki is completed
On 14 December construction of the 120 m retaining wall to support the 800 m long bypass in Berezniki was finished... More
15 November 2007 
Construction of a retaining wall to strengthen the 800 m long rail line in Berezniki
According to available information a decision has been taken to build a 120 m long retaining wall to strengthen a bypass rail line of 800 m in Berezniki... More
01 November 2007 
Construction of a 6 km long bypass railroad in Berezniki
A decision has been taken to build a 6 km long bypass railroad in the area of the sinkhole in Berezniki... More
on the first page
on the previous page
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
on following page
on last page


Archive
© International Potash Company
All rights reserved.
our address:
phone/fax:
e-mail:
p.o. box 486, Moscow,119034, Russia Phone: + 7 495 258 61 70/71
Fax:+ 7 495 258 61 72/91
ipc@ipcmos.com
Developed by:
RBC SOFT